# Airtable diary: 08-23-22

uid: 202208230800 tags: #airtable #journal

Startup routine:

  • Ran morning

Things I did:

things:///show?id=logbook&filter=Work

Things I need to do:

  • Do the server-side profiling, as per Keunwoo
  • [~] Finish drafting the PR for making the nonExtendedPeriod feature flag apply to workspaces.
  • [~] Draft a PR for the applicationDestroy support panel crud request.
  • Figure out what’s going on with shard assignments. - Shard assignments stats pages 202208230924
  • [~] Change mysql message poller so that the connection creation is resilient to read replica failures.
  • [~] Add more crud requests to the shard assignments scaling & resiliency test.
  • Message Junyi about the composite connection abstraction

Date
February 22, 2023